DG DESIGN / TOOLS

Renovation estimate

This calculation is indicative. Final pricing follows a project assessment.

WorksQuantityMaterial Unit Price GELSalary Unit PriceSubtotal
Dismantling Works
Dismantling 10 cm Block Wallsq.m0.00
Dismantling 20 cm Block Wallsq.m0.00
Drywall Dismantlingsq.m0.00
კაფელ - მეთლახის დემონტაჟიsq.m0.00
Old Wallpaper Dismantlingsq.m0.00
Internal Doors DismantlingPiece0.00
Laminate Dismantlingsq.m0.00
Light Fixtures DismantlingPiece0.00
Radiator DismantlingPiece0.00
Built-in Furniture DismantlingPiece0.00
Bathroom Accessories DismantlingPiece0.00
Wall Construction
Constructing 10 cm Block Wallsq.m0.00
Constructing 20 cm Block Wallsq.m0.00
Plastering - Floor Screeding
Gypsum Plastering up to 1.5 cmunit_sqm + unit_lm0.00
Sand Plastering up to 1.5 cmunit_sqm + unit_lm0.00
Floor Screeding by Hand up to 10 cmsq.m0.00
Floor Leveling with Adhesive Cementsq.m0.00
Filling Damaged Areas of the Floorlm0.00
Electricity
Electrical Wiring with 3X2.5 2X1.5 SectionPoint0.00
Distribution Box InstallationPiece0.00
Switch and Socket Box InstallationPiece0.00
Switch and Socket InstallationPiece0.00
Automatic Box InstallationPiece0.00
Automatic InstallationPiece0.00
Modem Box InstallationPiece0.00
Spotlight InstallationPiece0.00
Chandelier Installation up to 6 kgPiece0.00
Bris InstallationPiece0.00
LED Lighting Installationm0.00
Choke InstallationPiece0.00
Bathroom Extractor InstallationPiece0.00
Plumbing
Plumbing Point Installation (Cold-Hot)Point0.00
50-100 mm Sewer Pipe InstallationPoint0.00
Wall-Hung Tank InstallationPiece0.00
Built-In Mixer InstallationPiece0.00
Shower InstallationPiece0.00
Wall-Hung Sink InstallationPiece0.00
Hygienic Shower InstallationPiece0.00
Bathroom Accessories InstallationPiece0.00
Heating-Cooling
Heating Pipe InstallationPair0.00
Heating Pipe FixingPair0.00
Radiator and Bathroom Dryer InstallationPiece0.00
Collector InstallationPair0.00
Boiler InstallationPiece0.00
Air Conditioner InstallationPiece0.00
Painting Works
Filling Damaged Areas with Knauf Materiallm0.00
Corner Installation with Knauf Materialm0.00
Primingsq.m0.00
Crack Protection Corner Mesh Installationlm0.00
Spackling with Knauf Materialunit_sqm + unit_lm0.00
Paintable Paper Applicationunit_sqm + unit_lm0.00
Paintingunit_sqm + unit_lm0.00
Molding Installationm0.00
Invisible plinth mountingm0.00
Polyurethane decorative panels installationsq.m0.00
Invisible doors side processingPiece0.00
Polyurethane Baseboard Paintingm0.00
Gypsum Board Works
Single Level Ceiling Installation (60 Profile, Knauf Board, 5mm Profile)unit_sqm + unit_lm0.00
Beam Wrapping with Knauf Board and 5mm Profilelm0.00
Tiling Works
Small Tile Installation (20x20 or Smaller) with Ceresit Adhesiveunit_sqm + unit_lm0.00
Medium Tile Installation with Ceresit Adhesiveunit_sqm + unit_lm0.00
Wall Treatment with Hydro Insulation using Knauf Materialsq.m0.00
Flooring
Laminate Installationsq.m0.00
Parquet installationsq.m0.00
Polyurethane Baseboard Installationm0.00
Aluminum Edge and Joint Installationm0.00
Construction Waste RemovalUnit (trip)0.00
Transportation and Delivery of Renovation Materials to the ApartmentUnit (trip)0.00
Crane-Giraffe ServiceUnit (trip)0.00
Subtotal
0.00
3% Contingency
0.00
Service fee 10%
0.00
VAT
0.00
Grand total
0.00